Radomir Metal Industries will construct a PV park on their own territory.
The PV park will span on 1400 dca of industrial land and 500 dca on rooftops.
The investment worth 120 million EUR will be realized together with two German companies and will be financed by German banks, providing bank loan with interest of up to 3 percent.
The payback period is 15 years.
The PV park will be constructed on several stages, the first one starting end of this year and targeting 50 MW as a beginning.
'환경 에너지' 카테고리의 다른 글
스마트그리드 산업 본격 육성 (0) | 2010.07.31 |
---|---|
플랜트 건설방식중 E.P.C turn-key 방식이란? (0) | 2010.07.13 |
CO2, 흙으로 돌아가라! (0) | 2010.07.06 |
BULGARIA GOVT ASSUAGES FEARS OVER POWER UTILITIES SALE REVISION (0) | 2010.04.09 |
태양광 산업의 환경변화와 시사점 (0) | 2010.04.01 |